29.14.6 BalanceFlowPart
Topic Version | 1 | Published | 12/09/2016 | ||
For Standard | PRODML v2.0 | ||||
Type: | Enumeration | Stereotype: |
Specifies the kinds of subdivisions of a flow related to the stock balance.
Name |
Type |
Notes |
---|---|---|
adjusted closing |
Volume that remains after the operation of transfer. |
|
closing balance |
A volume that is the total volume on stock at the end of a time period. |
|
closing storage inventory |
A closing storage balance that is adjusted according to imbalance at end of period. |
|
completed lifting |
A volume that is the total volume of a hydrocarbon product that is exported from a stock within a given time period. |
|
gain/loss |
A volume that is a lack of proper proportion or relation between the corresponding input and lifting transactions. |
|
input to storage |
A volume that is the total volume of additions to a stock within a given time period. |
|
lifted |
A volume that is transferred ("lifted"). |
|
lifting entitlement |
A volume that is the contracted volume which can be transferred. |
|
lifting entitlement remaining |
A volume that is the contracted volume which is not transferred but which remains available for subsequent transfer. |
|
linepack |
A gas volume that is the quantity of gas which the operator responsible for gas transportation decides must be provided by the gas producing fields in order to make deliveries as requested by gas shippers and provide operating tolerances. |
|
opening balance |
A volume that is the total volume on stock at the beginning of a time period. |
|
opflex |
A gas volume that is the unused and available quantity of gas within a gas transportation system and/or at one or many gas producing fields that is accessible by the operator responsible for gas transportation for the purposes of alleviating field curtailment. |
|
partial lifting |
A volume that is the volume of a hydrocarbon product lifting up to a (not completed) determined point in time. |
|
pipeline lifting |
A volume that is the volume of a hydrocarbon product lifting transferred by pipeline. |
|
production - mass adjustment |
A part of a mass adjustment process of a given production volume. |
|
production -- value adjustment |
A value that is adjusted due to a change in the value of a product. |
|
production imbalance |
A gas volume that is the difference between gas volume entering and exiting a shipper's nomination portfolio. This will take into account all differences whatever the time or reason it occurs. |
|
swap |
A swap of a volume in between different parties (often used in crude sales),e.g. "I have this volume with this quality and value and you can give me this higher volume for it with a lower quality." |
|
tanker lifting |
A volume that is the volume of a hydrocarbon product lifting transferred by tanker. |
|
transaction |
Typically used within the cargo shipper operations and in this context: is a change in ownership as executed between shippers of the cargo. |
|
transfer |
A volume that is the volume of a hydrocarbon product which changes custody in the operation. |
|
unknown |
Unknown. |
Association |
Notes |
---|---|
From: BalanceFlowPart. To: TypeEnum Generalization |
|
From: ProductVolumeBalanceSet. To: BalanceFlowPart Dependency |