29.18.9 EstimationMethod
Topic Version | 1 | Published | 12/09/2016 | ||
For Standard | PRODML v2.0 | ||||
Type: | Enumeration | Stereotype: |
Specifies the methods for estimating deferred production.
Name |
Type |
Notes |
---|---|---|
analytics model |
analytics model |
|
decline curve |
decline curve |
|
expert recommendation |
recommendation text |
|
flowing material balance |
flowing material balance |
|
from last allocated volume |
from last allocated volume |
|
numerical reservoir simulation |
numerical reservoir simulation |
|
production profile |
production profile |
|
rate transient analysis |
rate transient analysis |
|
ratio analysis |
ration analysis |
|
reservoir model |
reservoir model |
|
well model |
well model |