10.1.3 Cement Job Design
Topic Version | 1 | Published | 11/11/2016 | |
For Standard | WITSML v2.0 |
At the highest level of the cement job object, design data can be captured regarding the type of cementing operation, associated string cemented, associated wellbore, and start and end dates. After the data has been imported into a system of record, data can be aggregated and analyzed for general performance data with regard to types of cement operations, duration of operation, etc.