12.4.25 OpsReportVersion
Topic Version | 1 | Published | 11/11/2016 | ||
For Standard | WITSML v2.0 | ||||
Type: | Enumeration | Stereotype: | «Enumeration» |
Version of the report, e.g., preliminary, normal, final, etc.
Name |
Type |
Notes |
---|---|---|
preliminary |
A report that has not yet been approved by the drilling operator. This report is normally issued at the beginning of the work day (e.g., 6:00 am). |
|
normal |
A daily status report that has been approved by the drilling operator. |
|
final |
A report that represents the final definitive status for the well. This report is typically issued some period of time (e.g., 6 months) after drilling has concluded. |
|
unknown |
The value is not known. Avoid using this value. All reasonable attempts should be made to determine the appropriate value. Use of this value may result in rejection in some situations. |
Association |
Notes |
---|---|
From: OpsReportVersion. To: TypeEnum Generalization |
|