12.8.10 MudLosses
Topic Version | 1 | Published | 11/11/2016 | ||
For Standard | WITSML v2.0 | ||||
Type: | Class | Stereotype: | «XSDcomplexType» |
Operations Mud Losses Schema.Captures volumes of mud lost for specific activities or onsite locations and total volumes for surface and down hole.
Name |
Type |
Notes |
---|---|---|
VolLostAbandonHole |
VolumeMeasure |
Mud volume lost downhole during abandonment. |
VolLostBhdCsgHole |
VolumeMeasure |
Mud volume lost downhole behind casing. |
VolLostCircHole |
VolumeMeasure |
Mud volume lost downhole while circulating. |
VolLostCmtHole |
VolumeMeasure |
Mud volume lost downhole while cementing. |
VolLostCsgHole |
VolumeMeasure |
Mud volume lost downhole while running casing. |
VolLostMudCleanerSurf |
VolumeMeasure |
Volume of mud lost in mud cleaning equipment (at surface). |
VolLostOtherHole |
VolumeMeasure |
Mud volume lost downhole from other location. |
VolLostOtherSurf |
VolumeMeasure |
Surface volume lost other location. |
VolLostPitsSurf |
VolumeMeasure |
Volume of mud lost in pit room (at surface). |
VolLostShakerSurf |
VolumeMeasure |
Volume of mud lost at shakers (at surface). |
VolLostTrippingSurf |
VolumeMeasure |
Volume of mud lost while tripping (at surface). |
VolTotMudLostHole |
VolumeMeasure |
Total volume of mud lost downhole. |
VolTotMudLostSurf |
VolumeMeasure |
Total volume of mud lost at surface. |
Association |
Notes |
---|---|
From: MudVolume.MudLosses 0..1To: MudLosses Association |