12.8.10 MudLosses

Topic Version1Published11/11/2016
For StandardWITSML v2.0
Type:ClassStereotype:«XSDcomplexType»

Operations Mud Losses Schema.Captures volumes of mud lost for specific activities or onsite locations and total volumes for surface and down hole.

Table 12.8.10-1 Attributes

Name

Type

Notes

VolLostAbandonHole

VolumeMeasure

Mud volume lost downhole during abandonment.

VolLostBhdCsgHole

VolumeMeasure

Mud volume lost downhole behind casing.

VolLostCircHole

VolumeMeasure

Mud volume lost downhole while circulating.

VolLostCmtHole

VolumeMeasure

Mud volume lost downhole while cementing.

VolLostCsgHole

VolumeMeasure

Mud volume lost downhole while running casing.

VolLostMudCleanerSurf

VolumeMeasure

Volume of mud lost in mud cleaning equipment (at surface).

VolLostOtherHole

VolumeMeasure

Mud volume lost downhole from other location.

VolLostOtherSurf

VolumeMeasure

Surface volume lost other location.

VolLostPitsSurf

VolumeMeasure

Volume of mud lost in pit room (at surface).

VolLostShakerSurf

VolumeMeasure

Volume of mud lost at shakers (at surface).

VolLostTrippingSurf

VolumeMeasure

Volume of mud lost while tripping (at surface).

VolTotMudLostHole

VolumeMeasure

Total volume of mud lost downhole.

VolTotMudLostSurf

VolumeMeasure

Total volume of mud lost at surface.

Table 12.8.10-2 Associations

Association

Notes

From: MudVolume.MudLosses

0..1To: MudLosses

Association