12.8.12 OpsReport
| Topic Version | 1 | Published | 11/11/2016 | ||
| For Standard | WITSML v2.0 | ||||
| Type: | Class | Stereotype: | «XSDcomplexType» | ||
Used to capture a daily drilling report focused on reporting from the service company to the operator. For a similar object whose focus is operator to partner or to governmental agency, see
|
Name |
Type |
Notes |
|---|---|---|
|
ConditionHole |
String64 |
Hole condition description. |
|
CostDay |
Cost |
Daily cost. |
|
CostDayMud |
Cost |
Daily mud cost. |
|
DiaCsgLast |
LengthMeasure |
Diameter of the last casing installed. |
|
DiaHole |
LengthMeasure |
Hole diameter. |
|
DistDrill |
LengthMeasure |
Distance drilled since the previous report. |
|
DistDrillRot |
LengthMeasure |
Distance drilled: rotating. |
|
DistDrillSlid |
LengthMeasure |
Distance drilled: sliding. |
|
DistHold |
LengthMeasure |
Distance covered while holding angle with a steerable drilling assembly. |
|
DistReam |
LengthMeasure |
Distance reamed. |
|
DistSteering |
LengthMeasure |
Distance covered while actively steering with a steerable drilling assembly. |
|
DTim |
TimeStamp |
Date and time the information is related to. |
|
Engineer |
String64 |
Name of the engineer. |
|
ETimCirc |
TimeMeasure |
Time spent circulating from start of the bit run. |
|
ETimDrill |
TimeMeasure |
Drilling time. |
|
ETimDrillRot |
TimeMeasure |
Time spent rotary drilling for the report interval. |
|
ETimDrillSlid |
TimeMeasure |
Time spent slide drilling from start of the bit run. |
|
ETimHold |
TimeMeasure |
Time spent with no directional drilling work (commonly in hours). |
|
ETimLoc |
TimeMeasure |
Time the rig has been on location (commonly in days). |
|
ETimReam |
TimeMeasure |
Time spent reaming from start of the bit run. |
|
ETimSpud |
TimeMeasure |
Time since the bit broke ground (commonly in days). |
|
ETimStart |
TimeMeasure |
Time from the start of operations (commonly in days). |
|
ETimSteering |
TimeMeasure |
Time spent steering the bottomhole assembly (commonly in hours). |
|
Forecast24Hr |
String2000 |
Forecast of activities for the next 24 hrs. |
|
Geologist |
String64 |
Name of the operator's wellsite geologist. |
|
Lithology |
String64 |
Description of the lithology for the interval. |
|
Maasp |
PressureMeasure |
Maximum allowable shut-in casing pressure. |
|
MdCsgLast |
MeasuredDepthCoord |
Measured depth of last casing. |
|
MdPlanned |
MeasuredDepthCoord |
Measured depth of plan for this day number. |
|
MdReport |
MeasuredDepthCoord |
The measured depth of the wellbore. |
|
NameFormation |
String64 |
Name of the formation. |
|
NumAFE |
String64 |
Authorization for expenditure (AFE) number that this cost item applies to. |
|
NumContract |
int |
Number of contractor personnel on board the rig. |
|
NumOperator |
int |
Number of operator personnel on board the rig. |
|
NumPob |
int |
Total number of personnel on board the rig. |
|
NumService |
int |
Number of service company personnel on board the rig. |
|
PresKickTol |
PressureMeasure |
Kick tolerance pressure. |
|
PresLotEmw |
MassPerVolumeMeasure |
Leak off test equivalent mud weight. |
|
Rig |
String64 |
A pointer to the rig used in this reporting period. |
|
RopAv |
LengthPerTimeMeasure |
Average rate of penetration through the interval. |
|
RopCurrent |
LengthPerTimeMeasure |
Rate of penetration at report time. |
|
StatusCurrent |
String2000 |
Current status description. |
|
Sum24Hr |
String2000 |
Summary of the operations and events for the reporting period (the previous 24 hours). |
|
Supervisor |
String64 |
Name of the operator's rig supervisor. |
|
Tubular |
String64 |
A pointer to the tubular assembly (as specified in the Tubular object) used in this report period. |
|
TvdCsgLast |
WellVerticalDepthCoord |
True vertical depth of the last casing installed. |
|
TvdLot |
WellVerticalDepthCoord |
True vertical depth of the leak-off test point. |
|
TvdReport |
WellVerticalDepthCoord |
True vertical depth of the wellbore. |
|
VolKickTol |
VolumeMeasure |
Kick tolerance volume. |
|
Association |
Notes |
|---|---|
|
From: OpsReport.Wellbore 1..1To: Wellbore Association |
|
|
From: OpsReport. To: AbstractObject Generalization |
|
|
From: OpsReport.WbGeometry 0..1To: WellboreGeometry Association |
Record of actual hole geometry at report time. |
|
From: OpsReport.PumpOp 0..*To: PumpOp Association |
|
|
From: OpsReport.MudInventory 0..*To: Inventory Association |
Mud inventory item and cost for the report interval. |
|
From: OpsReport.SupportCraft 0..*To: SupportCraft Association |
Support craft object container element. |
|
From: OpsReport.Hse 0..1To: Hse Association |
Health, safety and environmental information. |
|
From: OpsReport.RigResponse 0..1To: RigResponse Association |
Average rig response readings for the day. |
|
From: OpsReport.MudVolume 0..1To: MudVolume Association |
Description of mud built, received, etc. |
|
From: OpsReport.ShakerOp 0..*To: ShakerOp Association |
Container element for shaker operation elements. |
|
From: OpsReport.Weather 0..*To: Weather Association |
Meteorlogical readings for the day. |
|
From: OpsReport.DayCost 0..*To: DayCost Association |
Cost item for the report interval. |
|
From: OpsReport.Activity 0..*To: DrillActivity Association |
Activity breakdown, multiple for many activities. |
|
From: OpsReport.PitVolume 0..*To: PitVolume Association |
|
|
From: OpsReport.Personnel 0..*To: Personnel Association |
Personnel Records |
|
From: OpsReport.TrajectoryStation 0..*To: TrajectoryStation Association |
Survey station recorded during the report interval. |
|
From: OpsReport.BulkInventory 0..*To: Inventory Association |
Bulk item usage and cost. |
|
From: OpsReport.Scr 0..*To: Scr Association |
Slow circulation rate pressure test for well control operations. |
|
From: OpsReport.Fluid 0..*To: Fluid Association |
One fluid record. |
|
From: OpsReport.DrillingParams 0..*To: DrillingParams Association |
Average bottom hole assembly parameters for report duration or actual instances of bottom hole assembly operations. |