12.10.5 RiskSubCategory
Topic Version | 1 | Published | 11/11/2016 | ||
For Standard | WITSML v2.0 | ||||
Type: | Enumeration | Stereotype: | «Enumeration» |
Specifies the sub-category of risk, in relation to value of Risk Category.
Name |
Type |
Notes |
---|---|---|
gas kick |
||
shallow water influx |
||
other influx or kicks |
||
loss circulation |
||
poor hole cleaning |
||
good hole cleaning at high ROP |
Rate of Penetration |
|
high mud weight |
High mud weight (i.e., greater than 10 parts per US gallon). |
|
special additives needed |
||
gumbo problems |
||
high ECD - rheology related |
||
excessive circulation |
Greater than 2 hours. |
|
performing a kill |
||
mud weight change |
Greater than 0.5 parts per US gallon. |
|
excessive pipe cement scaling |
||
pit gain or loss |
Greater than ten barrles. |
|
mud stability problems |
||
shallow gas flow |
||
twist off |
||
stuck pipe |
Greater than 30 minutes. |
|
wireline stuck in hole |
||
stick and slip |
||
vibration - axial |
||
vibration - torsional |
||
vibration - transverse |
||
vibration unknown or rough drilling |
||
uneven wear of BHA |
||
uneven wear of drillstring |
||
excessive torque |
||
excessive drag |
||
reaming greater than 2 hours |
Greater than 2 hours. |
|
washouts |
||
tight hole or overPull |
||
failed inspections or fatigue wear |
||
mechanical |
||
drilling greater than 1000 feet/day |
Greater than 1000 feet per day. |
|
drilling greater than 2000 feet/day |
Greater than 2000 feet per day. |
|
drilling less than 20 feet/day |
Less than 20 feet per day. |
|
trips greater than 24 hours |
Greater than 24 hours. |
|
excessive time for BHA makeup |
Bottom Hole Assembly |
|
waiting on decisions |
||
waiting on weather |
||
waiting on tools |
||
sloughing or packoffs |
||
ballooning |
||
fracture problems |
||
unstable zones |
||
formation integrity test |
||
leak-off test |
||
tectonics |
||
pore pressure |
||
breakouts |
||
bed parallel |
||
wellbore stability |
||
excessive doglegs |
||
sidetrack |
||
BHA change for directional |
Bottom Hole Assembly |
|
wrong total flow area |
||
well collision - actual |
||
well collision - technical |
||
geosteering |
||
abnormal tendency changes |
||
resurveying |
||
in-field referencing (IFR) actions |
||
bit or BHA performance |
Bottom Hole Assembly |
|
drilling optimization |
||
bit balling |
||
lost cones or broken cutters |
||
excessive bit wear or gauge |
||
low rate of bit penetration |
||
high rate of bit penetration |
||
downhole tool |
||
surface system |
||
motor or rotary steerable system failure |
||
topdrive failure |
||
hoisting equipment failure |
||
circulating equipment failure |
||
electrical system failure |
||
blow out preventer events |
||
surface instrumentation problems |
||
rig communications |
||
completion equipment failure |
||
miscellaneous rig equipment |
||
tool or equipment failure |
||
squeeze jobs |
||
casing surge losses |
||
stuck casing or completion |
||
shoe failures |
||
early cement setup |
||
casing collapse |
||
milling |
||
excessive casing wear or cuttings |
||
excessive formation damage or skin |
||
casing rotation or reciprocation rqd |
||
broaching |
||
completion or casing |
||
stratigraphy |
||
fishing |
||
junk in hole |
||
delay due to political unrest |
||
rig move |
||
gas hydrates |
||
pending analysis |
||
riser disconnect |
||
other |
||
personnel |
||
environmental |
||
automotive |
||
asset |
||
information |
||
time |
||
HSE |
health, safety and environmental |
Association |
Notes |
---|---|
From: RiskSubCategory. To: TypeEnum Generalization |
|
From: Risk. To: RiskSubCategory Dependency |