12.3.9 CementJobReport
Topic Version | 1 | Published | 11/11/2016 | ||
For Standard | WITSML v2.0 | ||||
Type: | Class | Stereotype: | «XSDcomplexType» |
The as-built report of the job after it has been done.
Name |
Type |
Notes |
---|---|---|
CementDrillOut |
boolean |
Was the cement drilled out? Values are "true" (or "1") and "false" (or "0"). |
DensMeasBy |
String64 |
Method by which density is measured. |
DTimCementDrillOut |
TimeStamp |
Date and time that the cement was drilled out. |
DTimJobEnd |
TimeStamp |
Date and time of the end of the cement job. |
DTimJobStart |
TimeStamp |
Date and time of the start of the cement job. |
DTimPipeRotEnd |
TimeStamp |
Date and time that pipe rotation started. |
DTimPipeRotStart |
TimeStamp |
Date and time that pipe rotation started. |
DTimPlugSet |
TimeStamp |
Date and time that cement plug was set. |
DTimRecipEnd |
TimeStamp |
Date and time that pipe reciprocation ended. |
DTimRecipStart |
TimeStamp |
Date and time that pipe reciprocation started. |
DTimSqueeze |
TimeStamp |
Date and time of a squeeze. |
Association |
Notes |
---|---|
From: CementJobReport. To: AbstractCementJob Generalization |
|
From: CementJobReport.CementReportStage 1..*To: CementStageReport Association |
|
From: CementJob.JobReport 0..1To: CementJobReport Association |
Set of stages for the job (usually 1 or 2). |